1. The User can click on the Down arrow to Select Timeframe
2. Users can select Month/Year, Time and Days in the Select Time Frame tab.
-
- Month/Year can be select from a 12 month time period
- The time is selected as one chunk as from and to time.
- Days are selected as
- Mon-Thu
- Fri
- Sat
- Sunday
- Select all
3. Click Apply
The timeline bar appears with the time selected and the user can move the arrow to see different data based on the selected time frame. On clicking the arrow on the bar, the arrow moves to show the data automatically as an animation
Comments
0 comments
Please sign in to leave a comment.